logo

View all jobs

Optical (Centerstage) Engineer/SME

Multiple, US
Northeast:
Newark
New York
Mid-Atlantic:
Philadelphia
Mid-South:
Tampa
Orlando
Miami
West:
Los Angeles
San Diego
Phoenix/Tucson
Denver
Salt Lake City
Duration: 12 months
World Wide Technology, Inc. has an opportunity available for 4 Optical Engineers/SME's (will focus on Centerstage) in the Northeast, Mid-Atlantic, Mid-South and West US Regions. Qualified candidates will be familiar with the Cisco NCS 4000 and 6000 platforms, service provider environments and be able to oversee and verify site readiness and installations. One of the main requirements will be the ability to verify all cabling onsite compared to a cable run list and verify correct card layouts in each chassis. WWT will be providing training these Engineers up on the new Platform, Center Stage.
Responsibilities and Possible Project Tasks:
Qualified candidates ideally would be familiar with the Cisco NCS 4000 and 6000 platforms, service provider environments and be able to oversee and verify site readiness and installations. One of the main requirements will be the ability to verify all cabling onsite compared to a cable run list and verify correct card layouts in each chassis
On-site Project/Cabling Oversight
Site preparation
  • Power Cable Connection Verification
  • Operational Verification
  • Fabric Cables
  • Each LC Chassis – 48 ports to FC
  • MPO Cable labeling and testing
  • Management cables
  • Duplex LC Connections between Fabric Card Chassis (FCC) and Line Card Chassis (LCC) RP Cards
  • LC connector Labeling and Verification
  • Timing Cables
Each Chassis will add up to 4 Cat 6 Cables connection to Neighboring LCC
Cat 6 Cable Labeling and Verification
  • Knowledge transfer & consulting
System Turn-up / NEAT Support
Service Provider’s ACTP (automated certification test portal) Troubleshooting & Validation
  • Verify Chassis Configuration functioning
  • Verify Control Cable Connectivity
  • Verify MPO Fabric Connectivity
  • Verify Timing Connectivity
Data Integrity Verification
Verify Data Traffic between LCC
PRBS
X connect Configurations
Knowledge transfer & consulting
Project Oversight
  • On-site Project/Cabling Oversight and verification
Each LC Chassis – 48 ports to FC
Management & Timing cables
Knowledge transfer & consulting
  • System NEAT Turn-up Support
ACTP Troubleshooting & Validation
Network Management & Timing Verification
Knowledge transfer & consulting

Share This Job

Powered by